Sunday, September 20, 2009

Because you asked...

Well-- much has been done on the house of late. But pictures would not do justice, as the things that have happened are on the inside and only a walk-through video would help to see the progress. I will list the things you have to look forward to...and then tomorrow, I will video a walk through-- Just for you!!

1) Electric Rough in-- done
2) Plumbing Rough in-- done
3) HVAC Rough in-- done
4) RetracVac Rough in-- done
5) Insulation-- done
6) Siding done
7) SheetRock hung
8) SheetRock Taped
9) Flooring ordered/Scheduled
10) Roof Tar Papered
11) Shingles stocked
12) Pile of wood scraps halfway cleaned up

Tomorrow:
Painters scheduled to begin on Exterior
Garage Doors installed
Exterior Doors to be delivered

Wednesday:
Interior Doors/ Trim Package to be delivered
Shingles put on






1 comment:

Lost Woman said...

Holy scheduling nightmare Batman!

This is a full time job. I've been wondering about that little dormer window at the top, and am glad to see the sneak peak for an answer.

Sooo cool. I'm a bit envious quite honestly.

Will you be in before the snow flies?